Search This Blog

четверг, 15 ноября 2018 г.

ISRO – GSLV Mk III-D2/GSAT-29 Mission Success


ISRO – Indian Space Research Organisation logo.


Nov. 15, 2018



GSLV Mk III-D2/GSAT-29 Mission lift off

GSLV Mk III-D2/GSAT-29 Mission: The first orbit raising operation of GSAT-29 satellite has been successfully carried out today (15th November) by firing the Liquid Apogee Motor (LAM) engine of the satellite at 0834 Hrs IST for a duration of 4875 seconds.


Orbit Determination results from this LAM firing are:


– Apogee X perigee height was changed from 35897 km X 189 km  to 35745 km X 7642 km.


– Inclination was changed from 21.46 deg to 8.9 deg.


– Orbital period is 13 hours.



Lift-off and Onboard Camera View – ISRO

Video above: Onboard camera view of the GSLV Mk III-D2 rocket launching the GSAT-29 communication satellite from the Second Launch Pad of the Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota, on 14 November 2018, at 11:38 UTC (14:50 IST).


GSAT-29 satellite with a lift-off mass of 3423 kg, is a multi-beam, multiband communication satellite of India, configured around the ISRO’s enhanced I-3K bus. This is the heaviest satellite launched from India.



GSAT-29 satellite

GSAT-29 carries Ka/Ku-band high throughput communication transponders which will bridge the digital divide of users including those in Jammu & Kashmir and North Eastern regions of India. It also carries Q/V-band payload, configured for technology demonstration at higher frequency bands and Geo-stationary High Resolution Camera. carried onboard GSAT-29 spacecraft. An optical communication payload, for the first time, will be utilized for data transmission.


For more information about Indian Space Research Organisation (ISRO), visit: https://www.isro.gov.in/


Images, Video, Text, Credits: Indian Space Research Organisation (ISRO)/Günter Space Page/SciNews.


Greetings, Orbiter.chArchive link


Комментариев нет:

Popular last month